Beyond Manufacturing Resource Planning (MRP II): Advanced ...
Preview
Farn and Muhlemann [7] studied the effects of frequency of rescheduling on a single machine scheduling problem with sequence dependent setup times. Their findings are interesting since they determine that the best heuristic for the staticĀ ...